Project Timeline (Gantt) Preview
Sample data — live timelines render from mpdc_aip_lines + meo_project_milestones in PR3.
Track every infrastructure project end-to-end: budget, location, contractor, Program of Works, physical and financial accomplishment, inspections, photos, and status — from planning through turnover. Usa ra ka pindot, makita dayon ang tanan proyekto: asa dapita, pila ang budget, pila na ka percent ang nahuman.
Sample data — live timelines render from mpdc_aip_lines + meo_project_milestones in PR3.
mpdc_aip_lines, no duplication of AIP master.
Next
Sample distribution. Live counts query mpdc_aip_lines.submission_status
filtered to infrastructure / capital outlay / equipment categories in PR3.
mpdc_workflow_actions| PPA Code | Project | Barangay | Fund | ABC | Status |
|---|---|---|---|---|---|
MEO-2026-0001 |
Maranding Road Concreting | Maranding | General Fund (GF) | ₱5,000,000 | Ongoing |
MEO-2026-0002 |
Lala Proper Drainage Canal | Lala Proper | 20% Development Fund | ₱2,300,000 | Ongoing |
MEO-2026-0003 |
Camalan Multi-Purpose Building | Camalan | LDRRMF Capital | ₱3,400,000 | Substantial |
MEO-2026-0004 |
El Salvador Evacuation Center | El Salvador | LDRRMF Capital | ₱8,000,000 | Ongoing |
MEO-2026-0005 |
Magpatao Footbridge Repair | Magpatao | General Fund (GF) | ₱1,250,000 | Procurement |
MEO-2026-0006 |
Brgy Hall Roofing — Lala Proper | Lala Proper | General Fund (GF) | ₱700,000 | Completed |
Engineering projects link back to MPDC AIP lines via
mpdc_aip_lines.id. Each row below shows the MEO record and its AIP parent so the
mayor and budget officer can trace any disbursement back to the approved annual investment plan.
| MEO Code | AIP Line Ref | Project | Contract | Disbursed | Physical |
|---|---|---|---|---|---|
MEO-2026-0001 |
AIP-2026-0001 |
Maranding Road Concreting | ₱4,750,000 | ₱2,945,000 | 62% |
MEO-2026-0002 |
AIP-2026-0002 |
Lala Proper Drainage Canal | ₱2,180,000 | ₱545,000 | 30% |
MEO-2026-0003 |
AIP-2026-0003 |
Camalan Multi-Purpose Building | ₱3,200,000 | ₱2,815,000 | 88% |
MEO-2026-0004 |
AIP-2026-0004 |
El Salvador Evacuation Center | ₱7,850,000 | ₱942,000 | 12% |
MEO-2026-0005 |
AIP-2026-0005 |
Magpatao Footbridge Repair | ₱0 | ₱0 | 0% |
MEO-2026-0006 |
AIP-2026-0006 |
Brgy Hall Roofing — Lala Proper | ₱685,000 | ₱685,000 | 100% |
Each project carries its own Program of Works (Bill of Quantities). Click a card to open the full
POW table with quantity, unit cost, and line totals — sample data shown until PR3 wires
mpdc_project_boq.
| Date | Project | Inspector | Type | Findings | Severity |
|---|---|---|---|---|---|
| 2026-04-30 | Maranding Road Concreting | MEO Inspector | Subgrade | Compaction passed | Pass |
| 2026-04-22 | Lala Proper Drainage | MEO Inspector | Trench | Minor alignment fix | Minor |
| 2026-05-28 | Camalan Multi-Purpose Bldg | MEO Inspector | Roofing | No findings | Pass |
| 2026-04-08 | Brgy Hall Roofing — Lala Proper | MEO Inspector | Final | Acceptance ready | Pass |
Live inspections log to meo_inspections in PR2.
Live uploads land in meo_site_photos with thumbnail + EXIF GPS in PR2.
| Contractor | PCAB License | Projects | Contract Total | Disbursed |
|---|---|---|---|---|
| Lanao Construction & Supply Corp. | PCAB-LIC-12345 · Cat C-D · Small B |
1 | ₱4,750,000 | ₱2,945,000 |
| Mindanao Builders Inc. | PCAB-LIC-22987 · Cat C-D · Small A |
1 | ₱2,180,000 | ₱545,000 |
| Camalan Construction Services | PCAB-LIC-31055 · Cat D · Small B |
1 | ₱3,200,000 | ₱2,815,000 |
| Iligan Engineering Corp. | PCAB-LIC-44210 · Cat C · Medium A |
1 | ₱7,850,000 | ₱942,000 |
| TBL Roofing Specialists | PCAB-LIC-50884 · Cat D · Small B |
1 | ₱685,000 | ₱685,000 |
| Code | Project | Contract | Disbursed | Balance | Financial % |
|---|---|---|---|---|---|
MEO-2026-0001 |
Maranding Road Concreting | ₱4,750,000 | ₱2,945,000 | ₱1,805,000 | 58% |
MEO-2026-0002 |
Lala Proper Drainage Canal | ₱2,180,000 | ₱545,000 | ₱1,635,000 | 25% |
MEO-2026-0003 |
Camalan Multi-Purpose Building | ₱3,200,000 | ₱2,815,000 | ₱385,000 | 88% |
MEO-2026-0004 |
El Salvador Evacuation Center | ₱7,850,000 | ₱942,000 | ₱6,908,000 | 12% |
MEO-2026-0005 |
Magpatao Footbridge Repair | ₱0 | ₱0 | ₱0 | 0% |
MEO-2026-0006 |
Brgy Hall Roofing — Lala Proper | ₱685,000 | ₱685,000 | ₱0 | 100% |
| Totals | ₱18,665,000 | ₱7,932,000 | ₱10,733,000 | — | |
The Engineer’s Office owns this data — add, edit, update status, or delete projects here. Changes appear automatically in the MPDC “MEO Project Status” report.
| Code | Project | Physical % | Financial % | Slippage | Status | Report |
|---|---|---|---|---|---|---|
MEO-2026-0001 |
Maranding Road Concreting | 62% | 58% | +4% | Ongoing |
|
MEO-2026-0002 |
Lala Proper Drainage Canal | 30% | 25% | +5% | Ongoing |
|
MEO-2026-0003 |
Camalan Multi-Purpose Building | 88% | 88% | 0% | Substantial |
|
MEO-2026-0004 |
El Salvador Evacuation Center | 12% | 12% | 0% | Ongoing |
|
MEO-2026-0005 |
Magpatao Footbridge Repair | 0% | 0% | 0% | Procurement |
|
MEO-2026-0006 |
Brgy Hall Roofing — Lala Proper | 100% | 100% | 0% | Completed |
|
Saved updates appear in the MPDC “MEO Project Status” report automatically.
Pick any project below to render a print-ready profile (Mayor's One-Click View). Sample data renders
instantly; live records will pull from mpdc_aip_lines + meo_* tables in PR4.
| Item | Description | Qty | Unit | Unit Cost | Amount |
|---|---|---|---|---|---|
| Total | — | ||||
Sample BOQ structure. Live POW renders from mpdc_project_boq joined to
mpdc_aip_lines in PR3. Each line will support material/labor/equipment cost split + remarks.
Municipal Engineer’s Office
You are about to delete —.
It will be hidden from the MEO dashboard and the MPDC report. This is a soft-delete (the record is retained for audit).